A correct final number is not enough. The reviewer needs to see the method, the inputs, where those inputs came from, and how the calculation reached the result. If a stranger cannot follow it without calling you, the package is not finished.
The arithmetic and the documentation are separate jobs. This page is about finishing the second one.
Your calc is ready when it answers four questions on its face:
Use the same discipline found in a good engineering submittal: every number in the calc carries one of three tags — measured (you read it off a nameplate or a drawing; say which), specified (the plans or the customer fixed it; cite the sheet), or assumed (you chose it, and you say why). This does not guarantee an approval. It gives the reviewer a traceable package and gives you a clean place to correct an input when something changes.
However you run the arithmetic — by hand, spreadsheet, or software — the documentation requirement is identical: the method must be named and the intermediate values must be visible. A bare final number is unverifiable by construction.
Where a calculation is your next action, the free calculators at circuitcalcs.com compute service/feeder sizing, conduit fill, and voltage drop with the method stated and the intermediate values shown — each result carries the same edition and jurisdiction caveats this page does.
What goes in the envelope (or the portal upload), in order: the calc summary sheet (one page: method + edition, total computed load, service size selected) · the input inventory with provenance tags · the calculation detail with intermediate values · supporting documents you relied on (nameplate photos, plan sheets cited) · your license and contact block. One page of summary, then the evidence. Reviewers can only verify what they can follow.
Whether your jurisdiction requires a load calc for your specific job, and in what form, is the AHJ’s call — this page makes no claim about any jurisdiction’s submittal requirements.
The working template includes the summary, method record, provenance-tagged input inventory, calculation-detail table, supporting-document list, assumption log, revision record, and final submittal check.